[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"app":3,"projects-slug___it":208,"1-3-4":422},{"messages":4,"settings":186},[5,15,23,31,39,47,55,63,70,78,86,94,102,110,118,126,134,142,151,160,169,177],{"key":6,"translations":7},"Years of Experience",[8,11],{"value":6,"languages_code":9},{"code":10},"en-US",{"value":12,"languages_code":13},"Anni d’Esperienza",{"code":14},"it-IT",{"key":16,"translations":17},"Design",[18,20],{"value":16,"languages_code":19},{"code":10},{"value":21,"languages_code":22},"Progettazione",{"code":14},{"key":24,"translations":25},"Concept Design",[26,28],{"value":24,"languages_code":27},{"code":10},{"value":29,"languages_code":30},"Concept",{"code":14},{"key":32,"translations":33},"Technical Design and Construction Supervision",[34,36],{"value":32,"languages_code":35},{"code":10},{"value":37,"languages_code":38},"Progettazione e Direzione Lavori",{"code":14},{"key":40,"translations":41},"Architectural Design",[42,45],{"value":43,"languages_code":44},"Progetto Architettonico",{"code":14},{"value":40,"languages_code":46},{"code":10},{"key":48,"translations":49},"Technical Design and Coordination",[50,53],{"value":51,"languages_code":52},"Progetto Esecutivo e Coordinamento",{"code":14},{"value":48,"languages_code":54},{"code":10},{"key":56,"translations":57},"Concept and Technical Design",[58,60],{"value":56,"languages_code":59},{"code":10},{"value":61,"languages_code":62},"Concept e Progettazione",{"code":14},{"key":64,"translations":65},"Design and Construction Supervision",[66,68],{"value":64,"languages_code":67},{"code":10},{"value":37,"languages_code":69},{"code":14},{"key":71,"translations":72},"Technical Design",[73,75],{"value":71,"languages_code":74},{"code":10},{"value":76,"languages_code":77},"Progetto Esecutivo e Definitivo",{"code":14},{"key":79,"translations":80},"Construction Supervision",[81,83],{"value":79,"languages_code":82},{"code":10},{"value":84,"languages_code":85},"Direzione Lavori",{"code":14},{"key":87,"translations":88},"Coordination",[89,91],{"value":87,"languages_code":90},{"code":10},{"value":92,"languages_code":93},"Coordinamento",{"code":14},{"key":95,"translations":96},"Professionals",[97,99],{"value":95,"languages_code":98},{"code":10},{"value":100,"languages_code":101},"Collaboratori",{"code":14},{"key":103,"translations":104},"Built-up Areas",[105,107],{"value":103,"languages_code":106},{"code":10},{"value":108,"languages_code":109},"Superfici Edificate",{"code":14},{"key":111,"translations":112},"LEED® Gold (expected)",[113,115],{"value":111,"languages_code":114},{"code":10},{"value":116,"languages_code":117},"LEED® Gold (obiettivo)",{"code":14},{"key":119,"translations":120},"Landscape Consultant",[121,123],{"value":119,"languages_code":122},{"code":10},{"value":124,"languages_code":125},"Consulente Paesaggistico",{"code":14},{"key":127,"translations":128},"Group Leader, Executive Architecture, Engineering, Coordination, LEED and DfMA",[129,131],{"value":127,"languages_code":130},{"code":10},{"value":132,"languages_code":133},"Capogruppo, Progetto Esecutivo, Ingegneria, Coordinamento, LEED e DfMA",{"code":14},{"key":135,"translations":136},"Design and Artistic Direction",[137,139],{"value":135,"languages_code":138},{"code":10},{"value":140,"languages_code":141},"Progettazione e Direzione Artistica",{"code":14},{"key":143,"translations":144},"headquarters",[145,148],{"value":146,"languages_code":147},"Headquarters",{"code":10},{"value":149,"languages_code":150},"Sede",{"code":14},{"key":152,"translations":153},"download-certificate",[154,157],{"value":155,"languages_code":156},"Download certificate",{"code":10},{"value":158,"languages_code":159},"Scarica il certificato",{"code":14},{"key":161,"translations":162},"download-policy",[163,166],{"value":164,"languages_code":165},"Download policy",{"code":10},{"value":167,"languages_code":168},"Scarica la politica",{"code":14},{"key":170,"translations":171},"art231",[172,175],{"value":173,"languages_code":174},"Art. 231",{"code":10},{"value":173,"languages_code":176},{"code":14},{"key":178,"translations":179},"code-ethics",[180,183],{"value":181,"languages_code":182},"Code of Ethics",{"code":10},{"value":184,"languages_code":185},"Codice Etico",{"code":14},{"address":187,"email":188,"phone":189,"social_links":190,"vat":200,"certifications":201,"footer_image":207},"Via Pompeo Scipione Dolfi 7\n40122 Bologna\nItaly","sede@openproject.it","(+39) 051 4150411 ",[191,194,197],{"name":192,"link":193},"linkedin","https:\u002F\u002Fwww.linkedin.com\u002Fcompany\u002Fopen-project\u002F",{"name":195,"link":196},"facebook","https:\u002F\u002Fwww.facebook.com\u002Fopenproject84\u002F",{"name":198,"link":199},"instagram","https:\u002F\u002Fwww.instagram.com\u002Fopenproject_it\u002F","IT02436200378",[202],{"directus_files_id":203},{"id":204,"height":205,"title":206,"width":205},"fb1dbd9f-39bd-4e14-a3e6-5190ce2ec559",512,"Quality Syst Cert Is O9001 Invert",null,{"area":209,"certifications":210,"client":214,"completion_date":207,"id":215,"interactive_gallery_size":216,"location":217,"photo_credits":218,"related":219,"start_date":223,"team_composition":224,"title":227,"cover":228,"details_images":231,"footer_image":248,"gallery":251,"interactive_gallery":291,"interactive_gallery_translations":340,"sustainability":341,"tags":359,"translations":417},68800,[211,212,213],"LEED® Gold (target)","WELL® (target)","Parksmart® (target)","LendLease Italy SGR S.p.A.",2,"normal","Rho (MI)","Renders by MAD Architects",[220,221,222],"1","3","4","2020-01-01",[225],{"title":127,"value":226},"Open Project","MoLo",{"id":229,"title":230},"8e249bb9-c90f-4638-bab1-693deaa459d0","MoLo Cover",[232,240],{"directus_files_id":233},{"id":234,"title":235,"translations":236},"8f4ca8f1-59a8-4387-8231-1f93451c1441","MoLo Details 01",[237],{"directus_files_id":234,"languages_code":14,"caption":238,"id":239},"Accesso Ovest",112,{"directus_files_id":241},{"id":242,"title":243,"translations":244},"0b4dca57-c0d4-46de-bf3d-8df3235156f5","MoLo Details 02",[245],{"directus_files_id":242,"languages_code":14,"caption":246,"id":247},"Accesso Est",110,{"id":249,"title":250},"ce5b91c6-aae8-44ff-a356-66b23b99d52b","MoLo Footer",[252,257,262,267,270,275,280,284,288],{"directus_files_id":253},{"id":254,"title":255,"translations":256},"ba20f474-e5cf-4c8c-a201-ce78d91fccef","MoLo Gallery 01",[],{"directus_files_id":258},{"id":259,"title":260,"translations":261},"5b7567c8-dc8c-422a-b611-c866c56e6f21","MoLo Gallery 02",[],{"directus_files_id":263},{"id":264,"title":265,"translations":266},"1169e708-0a4e-4e87-a541-7037de9d25b6","MoLo Gallery 03",[],{"directus_files_id":268},{"id":249,"title":250,"translations":269},[],{"directus_files_id":271},{"id":272,"title":273,"translations":274},"9bc454c8-771e-4587-b427-a1ee6ce4c8c6","MoLo Gallery 04",[],{"directus_files_id":276},{"id":277,"title":278,"translations":279},"f1e0689a-1348-49fc-9f53-56430d9210ba","MoLo Gallery 05",[],{"directus_files_id":281},{"id":242,"title":243,"translations":282},[283],{"directus_files_id":242,"languages_code":14,"caption":246,"id":247},{"directus_files_id":285},{"id":234,"title":235,"translations":286},[287],{"directus_files_id":234,"languages_code":14,"caption":238,"id":239},{"directus_files_id":289},{"id":229,"title":230,"translations":290},[],[292,300,308,316,324,332],{"directus_files_id":293},{"id":294,"title":295,"translations":296},"d6acc2b2-e1e6-4d65-bd10-4b77e34ab6a8","MoLo Parcheggio",[297],{"directus_files_id":294,"languages_code":14,"caption":298,"id":299},"Parcheggio",22,{"directus_files_id":301},{"id":302,"title":303,"translations":304},"51595e58-a22b-4c8d-96cd-aa0ede328563","MoLo Spazi Aperti",[305],{"directus_files_id":302,"languages_code":14,"caption":306,"id":307},"Spazi aperti",24,{"directus_files_id":309},{"id":310,"title":311,"translations":312},"6bf5ce31-9cd7-4b7f-96bd-92b772db4a6c","MoLo Uffici+Lab",[313],{"directus_files_id":310,"languages_code":14,"caption":314,"id":315},"Uffici+Laboratori",28,{"directus_files_id":317},{"id":318,"title":319,"translations":320},"38dfdb56-c2a8-495d-ac63-ad23e7da97cb","MoLo Torri Evaporative",[321],{"directus_files_id":318,"languages_code":14,"caption":322,"id":323},"Torri evaporative",26,{"directus_files_id":325},{"id":326,"title":327,"translations":328},"0faaccf8-0339-4395-81f6-d6a716397658","MoLo Commerciale",[329],{"directus_files_id":326,"languages_code":14,"caption":330,"id":331},"Commerciale",20,{"directus_files_id":333},{"id":334,"title":335,"translations":336},"eb5e88f9-197c-493f-8e08-d5e8bbe223da","MoLo Centro Energetico",[337],{"directus_files_id":334,"languages_code":14,"caption":338,"id":339},"Centro energetico",18,[],[342,348],{"collection":343,"item":344},"single_fields",{"translations":345},[346],{"content":347},"\u003Ch2>\u003Cstrong>Standard di sostenibilit&agrave;\u003C\u002Fstrong>\u003C\u002Fh2>\n\u003Cp>MoLo rispetta elevati standard di sostenibilit&agrave;, insieme ad una serie di obiettivi definiti dal cliente, tra i quali la \u003Cstrong>Tassonomia UE\u003C\u002Fstrong>, Design For Manufacture and Assembly (\u003Cstrong>DFMA\u003C\u002Fstrong>). Aderisce inoltre a diversi protocolli di certificazione ambientale come \u003Cstrong>LEED\u003C\u002Fstrong>, \u003Cstrong>WELL\u003C\u002Fstrong> e \u003Cstrong>Parksmart\u003C\u002Fstrong>.\u003C\u002Fp>\n\u003Ch3>MoLo &amp; LEED\u003C\u002Fh3>\n\u003Cp>Il progetto &egrave; stato concepito per ottenere la certificazione LEED V4.1 BD+C. Allo scopo di raggiungere gli obiettivi di sostenibilit&agrave; richiesti dal cliente, &egrave; stata condotta un'Analisi del ciclo di vita (\u003Cem>Life Cycle Analysis\u003C\u002Fem> \u003Cstrong>LCA\u003C\u002Fstrong>) utilizzando software dedicato. La riduzione dell&rsquo;impatto ambientale &egrave; stata una delle sfide principali in fase di progettazione preliminare, viste le dimensioni dell&rsquo;edificio (area di superficie lorda GIA = 65,660 m&sup2;).\u003C\u002Fp>\n\u003Ch3>MoLo &amp; WELL\u003C\u002Fh3>\n\u003Cp>Durante la fase di progettazione esecutiva, MoLo ha l'obiettivo di ottenere la certificazione WELL Gold, la quale promuove \u003Cstrong>comfort e salute degli occupanti\u003C\u002Fstrong>, considerando un insieme di esigenze quali: comfort termico, visivo ed acustico, salubrit&agrave; dei materiali, qualit&agrave; dell&rsquo;aria, benessere fisico e mentale delle persone ed impatto dell&rsquo;edificio sulla \u003Cstrong>comunit&agrave; locale\u003C\u002Fstrong>.\u003C\u002Fp>\n\u003Ch3>Edificio Low Carbon\u003C\u002Fh3>\n\u003Cp>&Egrave; stata necessaria un'approfondita ricerca per stimare le \u003Cstrong>emissioni di carbonio incorporato\u003C\u002Fstrong> (\u003Cem>embodied carbon\u003C\u002Fem>) nel ciclo di vita dei materiali strutturali, come il cemento ed acciaio per le armature, nonch&eacute; l'acciaio da carpenteria, responsabili in genere di gran parte delle emissioni associate alla costruzione di un edificio.\u003Cbr \u002F>La strategia che ha permesso la riduzione di carbonio incorporato pi&ugrave; significativa &egrave; stata l'utilizzo di cementi a basso contenuto di clinker come il \u003Cstrong>cemento d'altoforno\u003C\u002Fstrong> (CEM III) per le strutture di fondazione ed elevazione. Allo stesso scopo &egrave; stata prevista un'\u003Cstrong>ottimizzazione dei massetti\u003C\u002Fstrong>, attraverso la \u003Cstrong>riduzione dello spessore\u003C\u002Fstrong> della stratigrafia e l'utilizzo di \u003Cstrong>aggregati alleggeriti\u003C\u002Fstrong> nel loro mix design.\u003Cbr \u002F>Un'altra strategia di mitigazione determinante, &egrave; stata l&rsquo;utilizzo \u003Cstrong>materiali ad alto contenuto di riciclato\u003C\u002Fstrong>, come acciai per le barre d'armatura (97%) e profili in alluminio estrusi per serramenti e facciate continue (75%), la quale ha permesso anche un risparmio di estrazione di materie prime.\u003Cbr \u002F>Inoltre, l'utilizzo di \u003Cstrong>componenti prefabbricati\u003C\u002Fstrong> ha permesso di ridurre le emissioni derivanti dalla fase di costruzione (A5), ottimizzando il fabbisogno energetico necessario alla costruzione e la quantit&agrave; di scarti di lavorazione in opera, in linea con i principi delineati dal \u003Cem>Design for Manufacturing and Assembly \u003C\u002Fem>(\u003Cstrong>DfMA\u003C\u002Fstrong>).\u003C\u002Fp>",{"collection":349,"item":350},"split_fields",{"left":351,"right":355},{"translations":352},[353],{"content":354},"\u003Cp>\u003Cimg src=\"https:\u002F\u002Fop-admin.non-linear.dev\u002Fassets\u002F952b9e2e-7ace-453f-b8ac-06805cc6c01d?width=3920&amp;height=2613\" alt=\"Molo Carbon Ita\" \u002F>\u003C\u002Fp>",{"translations":356},[357],{"content":358},"\u003Cp>\u003Cimg src=\"https:\u002F\u002Fop-admin.non-linear.dev\u002Fassets\u002Fdb1f5fa7-80eb-4f32-8b7c-4f185f931a48?width=3920&amp;height=2613\" alt=\"Molo Dfma Ita\" \u002F>\u003C\u002Fp>",[360,367,372,377,382,387,392,397,402,407,412],{"tags_id":361},{"destination":362,"id":363,"name":364,"slug":365,"sustainable":366},true,42,"Mixed use","mixed-use",false,{"tags_id":368},{"destination":362,"id":369,"name":370,"slug":371,"sustainable":366},23,"Regeneration","regeneration",{"tags_id":373},{"destination":366,"id":374,"name":375,"slug":376,"sustainable":366},29,"BIM","bim",{"tags_id":378},{"destination":366,"id":379,"name":380,"slug":381,"sustainable":366},10,"Concrete","concrete",{"tags_id":383},{"destination":366,"id":384,"name":385,"slug":386,"sustainable":366},11,"Glass","glass",{"tags_id":388},{"destination":366,"id":389,"name":390,"slug":391,"sustainable":366},38,"Infrastructure","infrastructure",{"tags_id":393},{"destination":366,"id":394,"name":395,"slug":396,"sustainable":362},1,"LEED","leed",{"tags_id":398},{"destination":366,"id":399,"name":400,"slug":401,"sustainable":362},6,"Parksmart","parksmart",{"tags_id":403},{"destination":366,"id":404,"name":405,"slug":406,"sustainable":366},12,"Steel","steel",{"tags_id":408},{"destination":366,"id":409,"name":410,"slug":411,"sustainable":362},34,"Sustainability","sustainability",{"tags_id":413},{"destination":366,"id":414,"name":415,"slug":416,"sustainable":362},5,"WELL","well",[418],{"languages_code":14,"description":419,"heading":420,"id":421,"projects_id":215},"\u003Cp>Nuovo landmark, al posto di quello che &egrave; stato il Padiglione Zero di Expo Milano 2015, il Mobility and Logistic Hub sar&agrave; un&rsquo;architettura di servizio, accogliendo al suo interno un maxi-parcheggio con 1.500 posti auto, distribuiti su 5 dei 7 livelli fuori terra, a cui si aggiunge un piano interrato.\u003C\u002Fp>\n\u003Cp>Sar&agrave; anche un punto nevralgico per l&rsquo;attrattivit&agrave; grazie al mix funzionale al suo interno: al piano terra un energy center e un&rsquo;area retail; in copertura e in una delle facciate terminali locali destinati all&rsquo;attivit&agrave; lavorativa (uffici e laboratori). Un raccordo che mette in relazione i luoghi e le azioni che si compiono in quei lembi di tessuto urbano. Snodo e approdo, allo stesso tempo.\u003C\u002Fp>\n\u003Cp>Il common ground costituisce il tessuto connettivo pubblico che integra le principali funzioni private dell&rsquo;area e il MoLo, per la sua posizione e configurazione e per le attivit&agrave; di servizio che accoglie, &egrave; inserito in questo sistema urbano con un forte carattere di permeabilit&agrave; (fisica e visiva), favorendo incontri e scambi fra le aree pubbliche e private, di accesso e fruizione fluida degli spazi.\u003C\u002Fp>","MoLo: questo il nome della nuova architettura-infrastruttura, all’interno dell’area West Gate di MIND (Milano Innovation District). MoLo sarà un hub infrastrutturale, la porta di accesso per chi arriva da Rho e il punto focale per chi percorre il Decumano e tutta MIND; ma anche una quinta dell’infrastruttura verde e pedonale, oltre che cerniera tra il distretto e il contesto circostante.",3,[423,428,433],{"slug":424,"title":425,"cover":426},"respiro","Respiro",{"id":427},"83ac3d58-eece-4f7c-8939-9bd56da511ab",{"slug":429,"title":430,"cover":431},"comparto-via-larga","Comparto Via Larga",{"id":432},"808b2dc6-a5bf-4bfb-8e9e-439eb00df5bd",{"slug":434,"title":435,"cover":436},"sede-cna","Sede CNA",{"id":437},"ef920279-7c53-4816-b246-6adfdb293d23"]